Builder Tango

Wire ampacity calculator

Check a conductor’s published ampacity after applying the stated adjustment factors.

Measurements

Enter 12′ 6″, 12.5 ft or 3.8 m in a length field.

Adjusted ampacity
35.035 A
Difference versus stated current
4.035 A
Numerical comparison
At or above the entered load

Use published values for your conductor, terminals, insulation, and conditions. This is an arithmetic check, not a wire specification or code determination.

How this is calculated

Verify before use. Have a licensed electrician verify the published ampacity for material, insulation, terminals, installation, correction factors and applicable adopted code.

Multiply the applicable published ampacity by the two entered correction factors. Compare the result with the specified design current.

Worked example

Table ampacity for this conductor: 55 A · Temperature correction factor: 91 % · Bundling adjustment factor: 70 % · Required design current: 31 A

  1. Multiply the applicable published ampacity by the two entered correction factors. Compare the result with the specified design current.
  2. Using those inputs, the primary result is 35.035.

Sources

Frequently asked questions

What goes into table ampacity for this conductor (a)?

Enter the measured or quoted table ampacity for this conductor (a) for this job. Follow the unit shown on the field.

How is wire ampacity calculator calculated?

Multiply the applicable published ampacity by the two entered correction factors. Compare the result with the specified design current.

What changes if temperature correction factor (%) changes?

Enter the new temperature correction factor (%) and recalculate. Use the full precision shown in the result before transferring it to a dependent estimate.

What should I check before using the result?

Use published values for your conductor, terminals, insulation, and conditions. This is an arithmetic check, not a wire specification or code determination.

How do I keep this calculation?

Use Copy result to capture the answer and its units.

Planning how to pay for the job?