Builder Tango

Voltage Drop Calculator

Estimate conductor voltage drop for a DC, single-phase, or balanced three-phase circuit.

Measurements

Enter 12′ 6″, 12.5 ft or 3.8 m in a length field.

ft if no unit
Estimated voltage drop
4.835 V
Drop as share of supply
2.324%
Estimated receiving voltage
203.165 V

Use the cable data and operating conditions required for the exact installation.

How this is calculated

Verify before use. Have a licensed electrician confirm conductor impedance at operating temperature, circuit arrangement, load assumptions and adopted code. It is an estimate of drop.

Multiply load current and one-way length by effective conductor impedance and the circuit factor. Include parallel conductors and express the result in volts and as a share of source voltage.

Worked example

208 V single-phase circuit, 17 A, 79 ft one-way, supplier resistance 1.8 Ω per 1,000 ft, no reactance, unity power factor and one conductor per phase.

  1. Multiply load current and one-way length by effective conductor impedance and the circuit factor. Include parallel conductors and express the result in volts and as a share of source voltage.
  2. Using those inputs, the primary result is 4.8348.

Sources

Frequently asked questions

What goes into resistance basis?

Enter the measured or quoted resistance basis for this job. Follow the unit shown on the field.

How is voltage drop calculator calculated?

Multiply load current and one-way length by effective conductor impedance and the circuit factor. Include parallel conductors and express the result in volts and as a share of source voltage.

What changes if circuit changes?

Enter the new circuit and recalculate. Use the full precision shown in the result before transferring it to a dependent estimate.

What should I check before using the result?

Resistive estimate. AC reactance, temperature, and code requirements can affect real installations.

How do I keep this calculation?

Use Copy result to capture the answer and its units.

Planning how to pay for the job?