Trim and molding calculator
Plan molding stock by total length or a saw-kerf takeoff that keeps each cut whole.
exact 34.02 ft with 8% waste
- Stock pieces
- 3
- Estimated footage
- 34.02 ft
This is a length estimate. Check cut layout and seams before ordering.
Job ticket
Trim and molding| Material | Raw amount | With waste | To buy |
|---|---|---|---|
| Molding stock | 31.5 ft | 34.02 ft+2.52 ft extra | 3 sticks12 ft per stick |
-
Molding stock
- Raw amount
- 31.5 ft
- With waste
- 34.02 ft+2.52 ft extra
- To buy
- 3 sticks12 ft per stick
Order options cover the same work. Choose the package or delivery option you need.
How this is calculated
Add run lengths, apply allowance, and divide by the selected stock length. Use a separate cut layout to verify indivisible runs or joints.
Worked example
Run lengths in feet: 10.25, 7.75, 13.5 · Stock length: 12 ft · Extra material: 8 %
- Add run lengths, apply allowance, and divide by the selected stock length. Use a separate cut layout to verify indivisible runs or joints.
- Using those inputs, the primary result is 3.
Sources
Frequently asked questions
What goes into molding planning?
Enter the measured or quoted molding planning for this job. Follow the unit shown on the field.
How is trim and molding calculator calculated?
Add run lengths, apply allowance, and divide by the selected stock length. Use a separate cut layout to verify indivisible runs or joints.
What changes if run lengths in feet changes?
Enter the new run lengths in feet and recalculate. Use the full precision shown in the result before transferring it to a dependent estimate.
What should I check before using the result?
This is a length estimate. Check cut layout and seams before ordering.
How do I build the order?
Check the job ticket for the measured quantity, allowance and the units to order.