Builder Tango

Trim and molding calculator

Plan molding stock by total length or a saw-kerf takeoff that keeps each cut whole.

Measurements

Enter 12′ 6″, 12.5 ft or 3.8 m in a length field.

ft if no unit
Molding stock
3 sticks to order

exact 34.02 ft with 8% waste

Stock pieces
3
Estimated footage
34.02 ft

This is a length estimate. Check cut layout and seams before ordering.

Job ticket

Trim and molding
MaterialRaw amountWith wasteTo buy
Molding stock 31.5 ft34.02 ft+2.52 ft extra 3 sticks12 ft per stick
  • Molding stock

    Raw amount
    31.5 ft
    With waste
    34.02 ft+2.52 ft extra
    To buy
    3 sticks12 ft per stick
Estimates only. Check with your supplier and local code.

How this is calculated

Add run lengths, apply allowance, and divide by the selected stock length. Use a separate cut layout to verify indivisible runs or joints.

Worked example

Run lengths in feet: 10.25, 7.75, 13.5 · Stock length: 12 ft · Extra material: 8 %

  1. Add run lengths, apply allowance, and divide by the selected stock length. Use a separate cut layout to verify indivisible runs or joints.
  2. Using those inputs, the primary result is 3.

Sources

Frequently asked questions

What goes into molding planning?

Enter the measured or quoted molding planning for this job. Follow the unit shown on the field.

How is trim and molding calculator calculated?

Add run lengths, apply allowance, and divide by the selected stock length. Use a separate cut layout to verify indivisible runs or joints.

What changes if run lengths in feet changes?

Enter the new run lengths in feet and recalculate. Use the full precision shown in the result before transferring it to a dependent estimate.

What should I check before using the result?

This is a length estimate. Check cut layout and seams before ordering.

How do I build the order?

Check the job ticket for the measured quantity, allowance and the units to order.

Planning how to pay for the job?