Builder Tango

Stock-length cut list optimizer

Fit measured lumber, trim or pipe cuts into available lengths without splicing parts.

Measurements

Enter 12′ 6″, 12.5 ft or 3.8 m in a length field.

in if no unit

Finished parts

Cut group 1
ft if no unit

Available stock

Stock length 1
ft if no unit
Stock length 2
ft if no unit
Stock pieces
4 pieces to order

exact 26.833 ft with 0% waste

Bought stock footage
32 ft
Kerf used
0.875 in
Leftover on cut sticks
5.094 ft

The ticket groups identical cut patterns. Any spare sticks for allowance are shown on the stock order line.

Job ticket

Stock-length cut list optimizer
MaterialRaw amountWith wasteTo buy
Stock pieces 26.833 ft26.833 ft+0 ft extra 4 pieces4 × 96 in
  • Stock pieces

    Raw amount
    26.833 ft
    With waste
    26.833 ft+0 ft extra
    To buy
    4 pieces4 × 96 in

Cut patterns

  • 3 sticks · 96 in stock · 46 + 46 in cuts
  • 1 sticks · 96 in stock · 46 in cuts
Estimates only. Check with your supplier and local code.

How this is calculated

Sort cut lengths from longest to shortest. Try the stock mix and each single stock length that can fit the longest part. Keep the least purchased footage, with fewer pieces as a tie-breaker. Charge kerf when a cut consumes material.

Worked example

Five 35 in and two 23 in cuts, 72 in stock, ⅛ in kerf, no waste.

  1. The finished parts total 221 in.
  2. Two 35 in cuts and their kerfs fit on each of two sticks. Put one 35 in plus one 23 in on the third.
  3. The last 23 in cut uses a fourth stick. Buy four 72 in sticks.

Sources

Frequently asked questions

Can I split a cut over two pieces?

No. Every listed part stays whole.

Do I have to cut a piece at exact stock length?

No. A part that uses the full usable length needs no extra kerf.

How do I allow for damaged ends?

Enter usable stock length after end trimming. Add separate allowance for defects.

Does this guarantee the global minimum?

The estimate compares several best-fit plans. More complex combinations may yield a better shop layout.

Can I mix lumber and pipe?

Run one list per compatible stock profile, material and finish.

Planning how to pay for the job?