Stock-length cut list optimizer
Fit measured lumber, trim or pipe cuts into available lengths without splicing parts.
exact 26.833 ft with 0% waste
- Bought stock footage
- 32 ft
- Kerf used
- 0.875 in
- Leftover on cut sticks
- 5.094 ft
The ticket groups identical cut patterns. Any spare sticks for allowance are shown on the stock order line.
Job ticket
Stock-length cut list optimizer| Material | Raw amount | With waste | To buy |
|---|---|---|---|
| Stock pieces | 26.833 ft | 26.833 ft+0 ft extra | 4 pieces4 × 96 in |
-
Stock pieces
- Raw amount
- 26.833 ft
- With waste
- 26.833 ft+0 ft extra
- To buy
- 4 pieces4 × 96 in
Order options cover the same work. Choose the package or delivery option you need.
Cut patterns
- 3 sticks · 96 in stock · 46 + 46 in cuts
- 1 sticks · 96 in stock · 46 in cuts
How this is calculated
Sort cut lengths from longest to shortest. Try the stock mix and each single stock length that can fit the longest part. Keep the least purchased footage, with fewer pieces as a tie-breaker. Charge kerf when a cut consumes material.
Worked example
Five 35 in and two 23 in cuts, 72 in stock, ⅛ in kerf, no waste.
- The finished parts total 221 in.
- Two 35 in cuts and their kerfs fit on each of two sticks. Put one 35 in plus one 23 in on the third.
- The last 23 in cut uses a fourth stick. Buy four 72 in sticks.
Sources
Frequently asked questions
Can I split a cut over two pieces?
No. Every listed part stays whole.
Do I have to cut a piece at exact stock length?
No. A part that uses the full usable length needs no extra kerf.
How do I allow for damaged ends?
Enter usable stock length after end trimming. Add separate allowance for defects.
Does this guarantee the global minimum?
The estimate compares several best-fit plans. More complex combinations may yield a better shop layout.
Can I mix lumber and pipe?
Run one list per compatible stock profile, material and finish.