Stone veneer mortar calculator

Order scratch-coat mortar and setting-bed mortar by measured area and layer depth.

Measurements

Enter 12′ 6″, 12.5 ft or 3.8 m in a length field.

Calculation scope. Scratch-coat and setting-bed quantities. Verify with a licensed professional before choosing how the veneer and its substrate are supported.

in if no unit
in if no unit

Measured areas

Area 1
ft² if no unit
ft² if no unit
Scratch coat · 80 lb
8 bags to order

exact 124.3 ft² with 10% waste

Net veneer area
113 ft²

Job ticket

Stone veneer mortar
MaterialRaw amountWith wasteTo buy
Scratch coat · 80 lb 113 ft²124.3 ft²+11.3 ft² extra 8 bagsThickness-adjusted · 17 ft² per bag
Setting bed · 80 lb 3.531 ft³3.884 ft³+0.353 ft³ extra 6 bags
  • Scratch coat · 80 lb

    Raw amount
    113 ft²
    With waste
    124.3 ft²+11.3 ft² extra
    To buy
    8 bagsThickness-adjusted · 17 ft² per bag
  • Setting bed · 80 lb

    Raw amount
    3.531 ft³
    With waste
    3.884 ft³+0.353 ft³ extra
    To buy
    6 bags
Estimates only. Check with your supplier and local code.

How this is calculated

Use the published scratch-coat coverage at ½ in, adjusted by thickness. Divide the setting-bed area times its measured average depth by mixed yield. Reserve bags separately per phase.

Worked example

85 ft² net; ½ in scratch and ¼ in setting bed, 80 lb bags, no waste.

  1. The ½ in scratch coat covers about 17 ft² per bag, so reserve 5 bags.
  2. The setting bed takes 85 × ¼ ÷ 12, about 1.771 ft³.
  3. At 0.71 ft³ per bag, reserve 3 bags for setting.

Sources

Frequently asked questions

Why are the coats separate?

The scratch coat and setting bed are placed separately and may have different thicknesses.

Can I omit scratch coat?

Enter zero only when your approved assembly omits that layer.

Do I count grout or pointing?

The estimate covers the two bedding layers. Measure and order pointing mortar separately.

What is the setting depth?

Use the average placed thickness under the approved veneer system.

Are these yields exact?

Texture, backing, application and field losses affect consumption.