Surface-bonding cement calculator
Estimate surface-bonding cement by coated face area and specified thickness.
QUIKWALL 50 lb coating
5 bags to order
exact 234.3 ft² with 10% waste
Job ticket
Surface-bonding cement| Material | Raw amount | With waste | To buy |
|---|---|---|---|
| QUIKWALL 50 lb coating | 213 ft² | 234.3 ft²+21.3 ft² extra | 5 bagsThickness-adjusted · 50 ft² per bag |
-
QUIKWALL 50 lb coating
- Raw amount
- 213 ft²
- With waste
- 234.3 ft²+21.3 ft² extra
- To buy
- 5 bagsThickness-adjusted · 50 ft² per bag
Order options cover the same work. Choose the package or delivery option you need.
Estimates only. Check with your supplier and local code.
How this is calculated
Scale the stated 50 ft² per 50 lb bag at ⅛ in inversely with depth. Calculate optional bedding mortar separately using one bag per 15 linear feet.
Worked example
105 ft² net at ¼ in and 21 ft of bedding; no extra allowance.
- At ¼ in, one bag covers 25 ft².
- Divide 105 by 25 and buy 5 bags for the faces.
- At one bag per 15 ft, reserve 2 more for bedding.
Sources
Frequently asked questions
Do I count both faces?
Measure each coated face separately. Include the ends and top if coated.
How does thickness change coverage?
Doubling thickness halves the modeled area per bag.
Is bedding always included?
Only when you enter a measured bedding length.
Can this specify a dry-stack wall?
Use your approved plans to establish the wall and coating requirements.
What if the wall surface varies?
Use separate estimates for areas with different specified thicknesses.