Surface-bonding cement calculator

Estimate surface-bonding cement by coated face area and specified thickness.

Measurements

Enter 12′ 6″, 12.5 ft or 3.8 m in a length field.

Calculation scope. Coverage for the selected surface and coat thickness. Verify with a licensed professional before using it in a load-bearing wall assembly.

in if no unit
ft if no unit

Measured areas

Area 1
ft² if no unit
ft² if no unit
QUIKWALL 50 lb coating
5 bags to order

exact 234.3 ft² with 10% waste

Job ticket

Surface-bonding cement
MaterialRaw amountWith wasteTo buy
QUIKWALL 50 lb coating 213 ft²234.3 ft²+21.3 ft² extra 5 bagsThickness-adjusted · 50 ft² per bag
  • QUIKWALL 50 lb coating

    Raw amount
    213 ft²
    With waste
    234.3 ft²+21.3 ft² extra
    To buy
    5 bagsThickness-adjusted · 50 ft² per bag
Estimates only. Check with your supplier and local code.

How this is calculated

Scale the stated 50 ft² per 50 lb bag at ⅛ in inversely with depth. Calculate optional bedding mortar separately using one bag per 15 linear feet.

Worked example

105 ft² net at ¼ in and 21 ft of bedding; no extra allowance.

  1. At ¼ in, one bag covers 25 ft².
  2. Divide 105 by 25 and buy 5 bags for the faces.
  3. At one bag per 15 ft, reserve 2 more for bedding.

Sources

Frequently asked questions

Do I count both faces?

Measure each coated face separately. Include the ends and top if coated.

How does thickness change coverage?

Doubling thickness halves the modeled area per bag.

Is bedding always included?

Only when you enter a measured bedding length.

Can this specify a dry-stack wall?

Use your approved plans to establish the wall and coating requirements.

What if the wall surface varies?

Use separate estimates for areas with different specified thicknesses.