Builder Tango

Fence material calculator

Count end, corner, gate and line posts. Build a separate shopping list for panels or pickets.

Measurements

Enter 12′ 6″, 12.5 ft or 3.8 m in a length field.

Calculation scope. Use the installed fence system and the post layout on your plans. Verify with a licensed professional before choosing post sizes, spacing or footing dimensions.

ft if no unit
in if no unit
in if no unit
in if no unit

Fence spans and gates

Span 1
ft if no unit
ft if no unit
Span 2
ft if no unit
ft if no unit
Span 3
ft if no unit
ft if no unit
Total fence posts
13 posts to order

Measured layout. Stock and concrete allowances are listed below.

Total bays
11 bays
Concrete per post
0.806 ft³
Single-hole bag estimate
2 bags

Enter spacing and hole dimensions from the chosen fence system and approved local requirements. This is a material count.

Job ticket

Fence
MaterialRaw amountWith wasteTo buy
End posts 2 posts2 posts+0 posts extra 2 posts
Corner posts 1 posts1 posts+0 posts extra 1 posts
Gate posts 2 posts2 posts+0 posts extra 2 posts
Line posts 8 posts8 posts+0 posts extra 8 posts
Gates · 4 ft opening 1 gates1 gates+0 gates extra 1 gates
Panels 11 panels12.1 panels+1.1 panels extra 13 panels
Post concrete 10.473 ft³11.52 ft³+1.047 ft³ extra 20 bags
  • End posts

    Raw amount
    2 posts
    With waste
    2 posts+0 posts extra
    To buy
    2 posts
  • Corner posts

    Raw amount
    1 posts
    With waste
    1 posts+0 posts extra
    To buy
    1 posts
  • Gate posts

    Raw amount
    2 posts
    With waste
    2 posts+0 posts extra
    To buy
    2 posts
  • Line posts

    Raw amount
    8 posts
    With waste
    8 posts+0 posts extra
    To buy
    8 posts
  • Gates · 4 ft opening

    Raw amount
    1 gates
    With waste
    1 gates+0 gates extra
    To buy
    1 gates
  • Panels

    Raw amount
    11 panels
    With waste
    12.1 panels+1.1 panels extra
    To buy
    13 panels
  • Post concrete

    Raw amount
    10.473 ft³
    With waste
    11.52 ft³+1.047 ft³ extra
    To buy
    20 bags
Add unit prices (optional)
Estimates only. Check with your supplier and local code.

How this is calculated

Round each clear span up by maximum spacing. Place line posts between ends. Share the measured corner junctions and use two structural gate ends per gate. Subtract the post from a round hole to find per-post concrete.

Worked example

29 ft and 14 ft panel runs with an 8 ft maximum bay, one shared corner, no gates and no waste. For concrete, use 10 in holes, 3½ in square posts, a 21 in fill depth and 0.60 ft³ per bag.

  1. Round up by 8 ft to get four bays on the first run and two on the second.
  2. Add five and three posts, then subtract one because the runs share a post.
  3. Order seven posts and six panels. The ticket separates the post types.

Sources

Frequently asked questions

What is a span?

A clear length between end conditions. Start a new span where a corner or gate interrupts the fence.

Where do I put a gate?

Enter it after the previous span. A following span, if present, starts at the second gate post.

Can rails use offcuts?

This takeoff reserves whole stock across each bay. Plan reuse separately with your actual rail cuts.

Are all posts the same?

No. The ticket separates ends, corner junctions, gate posts and field line posts.

How is concrete rounded?

The ticket estimates total mixed volume, rounds the total bags once and also shows bags for one isolated hole.

Planning how to pay for the job?