Builder Tango

Fast-setting post concrete calculator

Deduct the part of the post inside each hole and see whole bags per hole and for the job.

Measurements

Enter 12′ 6″, 12.5 ft or 3.8 m in a length field.

Calculation scope. Bag counts for measured or specified holes. Verify with a licensed professional before choosing post or footing dimensions.

Post holes

Hole group 1
in if no unit
in if no unit
in if no unit
Fast-setting post concrete
26 bags to order

exact 9.591 ft³ with 10% waste

South fence · per hole
1.246 ft³
South fence · per isolated hole
4 bags

Job ticket

Fast-setting post concrete
MaterialRaw amountWith wasteTo buy
Fast-setting post concrete 8.719 ft³9.591 ft³+0.872 ft³ extra 26 bags
  • Fast-setting post concrete

    Raw amount
    8.719 ft³
    With waste
    9.591 ft³+0.872 ft³ extra
    To buy
    26 bags
Estimates only. Check with your supplier and local code.

How this is calculated

Find the round hole area and subtract the occupied square or round post area. Multiply by actual concrete depth, add allowance and divide by bag yield.

Worked example

Five 10 in × 23 in holes around 3½ in square posts, 0.375 ft³ per bag, no waste.

  1. Subtract 12.25 in² of post from about 78.54 in² of hole.
  2. Each hole needs about 0.882 ft³.
  3. Buy 12 bags when pooling partial bags, or reserve 3 per isolated hole.

Sources

Frequently asked questions

Which depth do I enter?

Enter only the height filled with concrete. Exclude gravel and air above the fill line.

Why can per-hole counts be higher?

Pooling partial bags across holes can reduce the total order when the product and placement schedule allow it.

Can I add different diameters?

Add a group for each different set of dimensions.

Is the bag weight the yield?

Enter the mixed volume yield from the package.

Does this choose footing dimensions?

Use the dimensions and concrete specification in your approved design.

Planning how to pay for the job?