Concrete Mix Calculator
Estimate cement, sand, and aggregate from a specified dry-volume mix ratio.
exact 0.37 yd³ with 0% waste
- Dry cement
- 0.37 yd³
- Dry sand
- 0.74 yd³
- Dry aggregate
- 1.11 yd³
Volume estimate only. Use a specified mix design for strength, aggregate, and water.
Job ticket
Concrete Mix| Material | Raw amount | With waste | To buy |
|---|---|---|---|
| Dry cement | 0.37 yd³ | 0.37 yd³+0 yd³ extra | 0.37 yd³ |
| Dry sand | 0.74 yd³ | 0.74 yd³+0 yd³ extra | 0.74 yd³ |
| Dry aggregate | 1.11 yd³ | 1.11 yd³+0 yd³ extra | 1.11 yd³ |
-
Dry cement
- Raw amount
- 0.37 yd³
- With waste
- 0.37 yd³+0 yd³ extra
- To buy
- 0.37 yd³
-
Dry sand
- Raw amount
- 0.74 yd³
- With waste
- 0.74 yd³+0 yd³ extra
- To buy
- 0.74 yd³
-
Dry aggregate
- Raw amount
- 1.11 yd³
- With waste
- 1.11 yd³+0 yd³ extra
- To buy
- 1.11 yd³
Order options cover the same work. Choose the package or delivery option you need.
How this is calculated
Multiply required wet volume by the specified dry-volume factor. Divide the total dry volume among the approved mix proportions.
Worked example
Finished wet volume: 1.5 yd³ · Dry-to-wet volume factor: 1.48 · Cement parts: 1 · Sand parts: 2 · Aggregate parts: 3
- Multiply required wet volume by the specified dry-volume factor. Divide the total dry volume among the approved mix proportions.
- Using those inputs, the primary result is 0.37.
Sources
Frequently asked questions
What goes into finished wet volume?
Enter the measured or quoted finished wet volume for this job. Follow the unit shown on the field.
How is concrete mix calculator calculated?
Multiply required wet volume by the specified dry-volume factor. Divide the total dry volume among the approved mix proportions.
What changes if dry-to-wet volume factor changes?
Enter the new dry-to-wet volume factor and recalculate. Use the full precision shown in the result before transferring it to a dependent estimate.
What should I check before using the result?
Volume estimate only. Use a specified mix design for strength, aggregate, and water.
How do I build the order?
Check the job ticket for the measured quantity, allowance and the units to order.