Retaining Wall Calculator
Estimate rectangular retaining-wall units and cap blocks.
exact 63 blocks with 5% waste
- Wall blocks
- 63
- Courses
- 4
- Cap blocks at same length
- 15
Material estimate only. Confirm base, drainage, and structural requirements for your wall.
Job ticket
Retaining Wall| Material | Raw amount | With waste | To buy |
|---|---|---|---|
| Retaining wall blocks | 60 blocks | 63 blocks+3 blocks extra | 63 blocks |
| Cap blocks | 15 blocks | 15 blocks+0 blocks extra | 15 blocks |
-
Retaining wall blocks
- Raw amount
- 60 blocks
- With waste
- 63 blocks+3 blocks extra
- To buy
- 63 blocks
-
Cap blocks
- Raw amount
- 15 blocks
- With waste
- 15 blocks+0 blocks extra
- To buy
- 15 blocks
Order options cover the same work. Choose the package or delivery option you need.
How this is calculated
Verify before use. Verify the exact block system, height, reinforcement, soil, surcharge, drainage and permit requirements against an approved retaining-wall design.
Round up blocks per course and course count separately. Multiply, allow for extra pieces, and count cap blocks separately.
Worked example
Wall length: 19 ft · Wall face height: 2.5 ft · Block length: 15.5 in · Block height: 7.5 in · Extra material: 5 %
- Round up blocks per course and course count separately. Multiply, allow for extra pieces, and count cap blocks separately.
- Using those inputs, the primary result is 63.
Sources
Frequently asked questions
What goes into wall length?
Enter the measured or quoted wall length for this job. Follow the unit shown on the field.
How is retaining wall calculator calculated?
Round up blocks per course and course count separately. Multiply, allow for extra pieces, and count cap blocks separately.
What changes if wall face height changes?
Enter the new wall face height and recalculate. Use the full precision shown in the result before transferring it to a dependent estimate.
What should I check before using the result?
Material estimate only. Confirm base, drainage, and structural requirements for your wall.
How do I build the order?
Check the job ticket for the measured quantity, allowance and the units to order.