Paver calculator
Estimate pavers, pallet quantities, base stone, bedding sand and joint fill on separate lines.
exact 1,054.35 pcs with 10% waste
- Compacted base
- 3.287 yd³
- Loose base before waste
- 4.01 yd³
- Joint void before waste
- 2.851 ft³
Job ticket
Pavers| Material | Raw amount | With waste | To buy |
|---|---|---|---|
| Individual paversOrder option | 958.5 pcs | 1,054.35 pcs+95.85 pcs extra | 1,055 pavers |
| Whole paver palletsOrder option | 958.5 pcs | 1,054.35 pcs+95.85 pcs extra | 4 pallets |
| Base aggregate | 3.287 yd³ | 4.411 yd³+1.124 yd³ extra | 4.5 yd³Includes loose-volume factor |
| Bulk bedding sandOrder option | 0.657 yd³ | 0.723 yd³+0.066 yd³ extra | 0.75 yd³ |
| 60 lb bedding sandOrder option | 17.75 ft³ | 19.525 ft³+1.775 ft³ extra | 33 bags |
| Joint fill | 2.851 ft³ | 3.137 ft³+0.285 ft³ extra | 3.137 ft³ |
-
Individual pavers
Order option- Raw amount
- 958.5 pcs
- With waste
- 1,054.35 pcs+95.85 pcs extra
- To buy
- 1,055 pavers
-
Whole paver pallets
Order option- Raw amount
- 958.5 pcs
- With waste
- 1,054.35 pcs+95.85 pcs extra
- To buy
- 4 pallets
-
Base aggregate
- Raw amount
- 3.287 yd³
- With waste
- 4.411 yd³+1.124 yd³ extra
- To buy
- 4.5 yd³Includes loose-volume factor
-
Bulk bedding sand
Order option- Raw amount
- 0.657 yd³
- With waste
- 0.723 yd³+0.066 yd³ extra
- To buy
- 0.75 yd³
-
60 lb bedding sand
Order option- Raw amount
- 17.75 ft³
- With waste
- 19.525 ft³+1.775 ft³ extra
- To buy
- 33 bags
-
Joint fill
- Raw amount
- 2.851 ft³
- With waste
- 3.137 ft³+0.285 ft³ extra
- To buy
- 3.137 ft³
Order options cover the same work. Choose the package or delivery option you need.
Add unit prices (optional)
How this is calculated
Divide area by the modular paver footprint. Multiply area by each layer depth independently. Adjust loose aggregate for compaction. Estimate joint volume by the open fraction of each module times the fill depth.
Worked example
200 ft², 7¾ × 3¾ in pavers, ¼ in joints, 1¾ in joint fill, 5 in compacted base, 1.22 loose-volume factor, 1 in bedding, 270 pieces per pallet, 10% waste.
- An 8 × 4 in installed module covers 32 in². The 200 ft² area takes 900 positions.
- Allow 990 pieces with waste, or four whole pallets at 270 pieces per pallet.
- The compacted base is about 3.086 yd³. Applying the loose factor and waste gives 4.142 yd³ before purchase rounding.
Sources
- Belgard Paving Systems Installation Guide
- Sakrete Multi-Purpose Sand technical data sheet
- Sakrete PermaSand technical data sheet
Frequently asked questions
Why are base and bedding separate?
They use different materials and placed thicknesses.
What does a compaction factor of 1.22 mean?
Allow 1.22 cubic yards of loose aggregate per installed cubic yard. Replace it with your supplier’s factor.
Can all joints use the same fill depth?
Enter the installed depth required by the joint product. Beveled edges and shaped pavers change the void size.
Do I have to buy whole pallets?
Some suppliers sell individual pieces. The ticket shows both options.
How are bags estimated?
Bedding bags use a named published yield. Joint fill bag counts require the yield for your selected product and installation.