Concrete resurfacer calculator
Estimate bags of concrete resurfacer by the measured area and thickness of each zone.
exact 1.65 ft³ with 10% waste
- Main patch
- 1.5 ft³
Job ticket
Concrete resurfacer| Material | Raw amount | With waste | To buy |
|---|---|---|---|
| Sakrete Flo-Coat 40 lb | 1.5 ft³ | 1.65 ft³+0.15 ft³ extra | 5 bags18 ft² per bag at ¼ in; approximate mixed yield 0.4 ft³ |
-
Sakrete Flo-Coat 40 lb
- Raw amount
- 1.5 ft³
- With waste
- 1.65 ft³+0.15 ft³ extra
- To buy
- 5 bags18 ft² per bag at ¼ in; approximate mixed yield 0.4 ft³
Order options cover the same work. Choose the package or delivery option you need.
How this is calculated
Multiply each zone’s net area by its own depth in feet. Add the placed volumes, add allowance and divide by the product’s published or entered placed yield before rounding once.
Worked example
36 ft² at 1/4 in; use Sakrete Flo-Coat 40 lb with no extra allowance.
- Multiply each zone’s area by its depth in feet.
- Add the zones for 0.75 ft³.
- Divide by the listed product yield and order 2 whole bags.
Sources
Frequently asked questions
Can I enter separate depths?
Add a zone for each measured area and its representative depth.
Does the depth limit change with the product?
Yes. The built-in preset checks the cited single-placement range where specified. Enter the limits when using a custom material.
Which yield do I use?
Use placed yield from the exact package, in cubic feet.
Does the estimate include primer or base repair?
Order primer, reinforcement or base repair separately when specified by the system.
Should I average the whole job?
Separate zones when the thickness differs substantially or any area may exceed the product limit.