Builder Tango

Concrete resurfacer calculator

Estimate bags of concrete resurfacer by the measured area and thickness of each zone.

Measurements

Enter 12′ 6″, 12.5 ft or 3.8 m in a length field.

Depth zones

Zone 1
ft² if no unit
in if no unit
Sakrete Flo-Coat 40 lb
5 bags to order

exact 1.65 ft³ with 10% waste

Main patch
1.5 ft³

Job ticket

Concrete resurfacer
MaterialRaw amountWith wasteTo buy
Sakrete Flo-Coat 40 lb 1.5 ft³1.65 ft³+0.15 ft³ extra 5 bags18 ft² per bag at ¼ in; approximate mixed yield 0.4 ft³
  • Sakrete Flo-Coat 40 lb

    Raw amount
    1.5 ft³
    With waste
    1.65 ft³+0.15 ft³ extra
    To buy
    5 bags18 ft² per bag at ¼ in; approximate mixed yield 0.4 ft³
Estimates only. Check with your supplier and local code.

How this is calculated

Multiply each zone’s net area by its own depth in feet. Add the placed volumes, add allowance and divide by the product’s published or entered placed yield before rounding once.

Worked example

36 ft² at 1/4 in; use Sakrete Flo-Coat 40 lb with no extra allowance.

  1. Multiply each zone’s area by its depth in feet.
  2. Add the zones for 0.75 ft³.
  3. Divide by the listed product yield and order 2 whole bags.

Sources

Frequently asked questions

Can I enter separate depths?

Add a zone for each measured area and its representative depth.

Does the depth limit change with the product?

Yes. The built-in preset checks the cited single-placement range where specified. Enter the limits when using a custom material.

Which yield do I use?

Use placed yield from the exact package, in cubic feet.

Does the estimate include primer or base repair?

Order primer, reinforcement or base repair separately when specified by the system.

Should I average the whole job?

Separate zones when the thickness differs substantially or any area may exceed the product limit.

Planning how to pay for the job?