Asphalt cold patch calculator
Estimate asphalt cold patch bags from the area and final compacted depth of each pothole.
exact 0.974 ft³ with 10% waste
- Main patch
- 0.885 ft³
Job ticket
Asphalt cold patch| Material | Raw amount | With waste | To buy |
|---|---|---|---|
| QUIKRETE Blacktop Patch 60 lb | 0.885 ft³ | 0.974 ft³+0.089 ft³ extra | 2 bags0.6 ft³ per bag |
-
QUIKRETE Blacktop Patch 60 lb
- Raw amount
- 0.885 ft³
- With waste
- 0.974 ft³+0.089 ft³ extra
- To buy
- 2 bags0.6 ft³ per bag
Order options cover the same work. Choose the package or delivery option you need.
How this is calculated
Multiply each zone’s net area by its own depth in feet. Add the placed volumes, add allowance and divide by the product’s published or entered placed yield before rounding once.
Worked example
4.8 ft² at 3 in; use QUIKRETE Blacktop Patch 60 lb with no extra allowance.
- Multiply each zone’s area by its depth in feet.
- Add the zones for 1.2 ft³.
- Divide by the listed product yield and order 2 whole bags.
Sources
Frequently asked questions
Can I enter separate depths?
Add a zone for each measured area and its representative depth.
Does the depth limit change with the product?
Yes. The built-in preset checks the cited single-placement range where specified. Enter the limits when using a custom material.
Which yield do I use?
Use compacted coverage from the exact package, in cubic feet.
Does the estimate include primer or base repair?
Order primer, reinforcement or base repair separately when specified by the system.
Should I average the whole job?
Separate zones when the thickness differs substantially or any area may exceed the product limit.